Senvion Installs First Prototype of 3.4M140 EBC
Hamburg, Germany - Senvion has successfully completed the installation of the first 3.4M140 EBC turbine prototype in Heckelberg for the Notus energy Group. The prototype in Heckelberg can power nearly 3,000 households per year despite low wind conditions.
The Senvion 3.4M140 is equipped with the Next Electrical System (NES), which Senvion introduced for its 3.XM series at the HANNOVER MESSE 2015. The gearbox-based concept, which features an asynchronous generator and a fully rated converter, permits stable grid feed-in and satisfies the future grid requirements in a range of markets.
Source: IWR Online, 15 Aug 2017